Road maintenance programme 2026 to 2027
Find out how we plan to improve roads, pavements and transport infrastructure.
Funding to improve our roads
Brighton & Hove has over 390 miles of roads and cycle lanes and 750 miles of pavement. Every year, we receive funding from the government for transport schemes.
In total, more than £8.8 million has been granted by the Department for Transport for improving the city’s roads, pavements and transport network in 2026/27.
It means we’ll be spending:
- almost £4 million on improving our roads
- £2.2 million on fixing immediate problems on our roads, such as potholes and other road repairs
- over £1m on making our pavements better
- £200,000 on accessibility improvements, including dropped kerbs, in addition to the improved pavements being delivered through planned maintenance and ongoing projects
- £360,000 for safer roads and junctions, and school streets schemes
- more than £2 million on helping to deliver major projects
Find out about roadworks and events happening in your area using One.Network
One.Network is a third-party provider that collects data from all over the country, other councils, and third parties such as utility companies. This information helps you know what's happening in your local area and when, so you can plan your journey. The map is updated daily with reports.
Planned road maintenance programme
In 2026 to 2027, we plan to treat or resurface more than 137,612 square metres of road in Brighton & Hove. This is done in different ways. Below is our planned programme.
Micro-asphalt
We will apply a layer of microasphalt to roads. This will make the surface smoother, skid-resistant and watertight. It can extend the life of the road by around 10 years and reduce the need for ongoing pothole repair.
The table below shows the schedule for the micro-asphalt work.
| Road | Location | Ward | Number of square metres | Dates programmed for full road closure | Status |
|---|---|---|---|---|---|
| Old Shoreham Road | Boundary Road – Holmes Avenue | Hangleton & Knoll | 15,912 | July 2026 | Programmed in |
| Coleman Street | Whole Road | Hanover & Elm Grove | 1,652 | July 2026 | Programmed in |
| Draxmont Way | Whole Road | Preston Park | 1,493 | July 2026 | Programmed in |
| Exeter Street | Whole Road | Preston Park | 1,893 | July 2026 | Programmed in |
| Fonthill Road | Whole Road | Goldsmid | 3,643 | July 2026 | Programmed in |
| Matlock Road and Tivoli Road | Whole Road | Preston Park | 3,464 | July 2026 | Programmed in |
| Montpelier Road | Montpelier Terrace – Clifton Hill | Regency | 2,095 | July 2026 | Programmed in |
| Clifton Hill | Whole Road | Regency | 2,051 | July 2026 | Programmed in |
| Russell Square | Whole Road | Regency | 1,195 | July 2026 | Programmed in |
| Silwood Street, Silwood Road, Oriental Street | Whole Road | Regency | 3,625 | July 2026 | Programmed in |
| Dyke Road Avenue | Woodland Drive – Barrowfield Drive | Westdene & Hove Park | 12,122 | August 2026 | Programmed in |
| Chalfont Drive | Whole Road | Westdene & Hove Park | 2,958 | August 2026 | Programmed in |
| Withdean Avenue | Whole Road | Preston Park, Westdene & Hove Park | 875 | August 2026 | Programmed in |
| Warren Road | Wilson Ave – Tenantry Down Road | Moulsecoomb & Bevendean, Hanover & Elm Grove, Whitehawk & Marina | 6,848 | August 2026 | Programmed in |
| Elm Grove | Freshfield Road – Sandown Road | Hanover & Elm Grove | 3,521 | August 2026 | Programmed in |
| Bernard Road | Whole Road | Hanover & Elm Grove | 2,647 | August 2026 | Programmed in |
| Sandown Road | Whole Road | Hanover & Elm Grove | 1,918 | August 2026 | Programmed in |
| Hangleton Way | Spencer Ave – Hardwick Way | Hangleton & Knoll | 2,868 | July 2026 | Programmed in |
| Preston Drove | Whole Road | Preston Park, Hollingdean & Fiveways | 10,302 | Not set | Programmed in |
| Stapley Road | Whole Road | Hangleton & Knoll | 4,126 | July 2026 | Programmed in |
Machine Patching
Machine patching is a process used to repair damaged sections of a road surface, such as potholes or cracks. It involves repairing small areas to restore the road's integrity and improve its condition.
The table below shows the schedule for the machine patching work. These roads are currently still being assessed and will be going through the tender stage and so are subject to change depending on the tender returns and the budget allocated.
| Road | Location | Ward | Status |
|---|---|---|---|
| Boyces Street | Whole Road | Regency | Tender Stage |
| Lewes Road | Southbound approach and junction with Wollards Way | Coldean & Stanmer | Tender Stage |
| Mile Oak Road | North of A27 to authority boundary | North Portslade | Tender Stage |
| Kingsway | Hove Street – opposite 151 | Westbourne & Poet's Corner | Tender Stage. Potentially delivered with active travel scheme |
| The Ridgeway | Ridgeway Gardens – Crescent Drive South | Woodingdean | Tender Stage |
| Elm Grove | Bernard Road – Hallet Road | Hanover & Elm Grove | Tender Stage |
| Hampton Street | Spring Street – Hampton Place | Regency | Tender Stage |
| South Street | Whole Road | Regency | Tender Stage |
| Hardwick Way | Hangleton Way – Hardwick Road | Hangleton & Knoll | Tender Stage |
| Florence Place | Ditchling Road – Cemetery Access Point | Hollingdean & Fiveways | Tender Stage |
| Craven Road | Junction with Queensway | Queen's Park | Tender Stage |
| Western Terrace | Whole Road | Regency | Tender Stage |
| Oxford Place | Junction with Ditchling Road | West Hill & North Laine | Tender Stage |
| Rosehill Terrace | London Terrace – Kingsbury Road | West Hill & North Laine | Tender Stage |
| Station Approach | Goldstone Villas – Denmark Villas | Goldsmid | Tender Stage |
| Mackie Avenue | Whole Road | Patcham & Hollingbury | Tender Stage |
| Carden Avenue | Whole Road | Patcham & Hollingbury | Tender Stage |
| Braybon Avenue | Whole Road | Patcham & Hollingbury | Tender Stage |
Full resurfacing
Full resurfacing involves replacing the existing road surface with new asphalt or macadam (tarmac). The existing road is removed to the required depth before being reinstated with new material.
The table below shows the schedule for the full resurfacing work. These roads and extents are subject to change upon tender submissions.
| Road | Location | Ward | Number of Square metres | Status |
|---|---|---|---|---|
| Cuckmere Way | Carden Hill – Outside 162 | Patcham & Hollingbury | 1,176 | Tender stage |
| Foundary Street and Queens Gardens | Whole Road | West Hill & North Laine | 1,842 | Tender stage |
| Lewes Road | Selsfield Drive – outside 28 | Moulsecoomb & Bevendean, Hollingdean & Fiveways, and Coldean & Stanmer | 20,904 | Tender stage |
| Queens Road | Terminus Street – outside 98 | West Hill & North Laine | 2,043 | Tender stage |
| Richmond Terrace | Whole Road | Hanover & Elm Grove, West Hill & North Laine | 4,757 | Tender stage |
| St George’s Road | Marine Gardens – Eaton Place | Kemptown | 6,220 | Tender stage |
| Upper Rock Gardens | Northbound lane along whole road | Kemptown | 775 | Tender stage |
| Western Road | Holland Road – Montpelier Road | Brunswick & Adelaide, Regency | 6,500 | Tender stage |
| Church Road and Trafalgar Road | Wellington Road – outside 115 | South Portslade | 8,287 | Tender stage |
| Kingsway | Sackville Gardens – Roman Road | Westbourne & Poet's Corner, Wish | In design stage | Delivered with Active Travel Scheme |
Repairing potholes and defects
As well as the planned programme, we carry out hundreds of repairs to fix potholes and other defects.
This includes pedestrian guard railing and pavement repairs, which include:
- rocking slabs
- block replacement
- bollards
- tree root damage
- kerb replacement
Where possible, we try to carry out work to prevent potholes and defects from appearing. It costs, on average, £200/m2 to repair a pothole in a failed road but just £10/m2 to treat a good road and prevent potholes from forming in the first place.
Local Highways Maintenance Transparency Report
The Department for Transport (DfT) has requested that all local highways authorities publish information about their highways maintenance activities. This is so we can demonstrate to local taxpayers the difference that funding is making in our area.
View the Local Highways Maintenance Transparency Report June 2025.